Instructions:
1. Clean up the base surface, remove surface dust, remove impurities and dirt, keep the surface solid and clean.
2. Treatment of large seams: if more than 5mm seams are covered with fiberglass before construction.
3. Waiting for curing: The surface drying time is 20-30 minutes, the curing time is about 24 hours, depending on the actual curing words.
Product features: ∙ waterproof leak product, the product possesses wide application, convenient quick dry weather resistance, waterproof plugging, anti-seepage moisture proof, wear-resisting, etc. ∙ applicable for pipe wrapping, walls, steel canopy, roof, roof and other base object interface, crack waterproof leakproof leaking water seepage