Product description
Lay the first tile, leaving more than 2mm (with cross gaskets). Close to tile.
Insert T-pins along the gap between tiles.
Then rotate 180 degrees and the T-needle is stuck at the bottom of the two tiles.
Adjust the lid with a hand/special wrench until the two tiles are on the same level.
After leveling for about 5-6 hours, before the cement/adhesive is completely dried, rotate the lid in reverse and take out the 180 degree T needle until the word is removed.
1.Wear-resistant, recyclable.
2.Easy to use in DIY operation.
3.Balance tiles in the same horizontal position.
4.Improve the installation speed of tile.
5.Reduce the fatigue/pressure of installers.
6.There is hardly any crackless, flat surface.
7.It reduces the need for grinding and polishing.
8.Prevent tiles from moving during solidification.